Top 10 project reports of the year

From Leicestershire to the Antarctic, Construction News rounds up some of the best builds visited this year, ranked by the most read online

10) Intu dazzles shoppers with glass roof and floor

At Manchester’s Trafford Centre, £75m is being spent on regenerating a wing known as Barton Square. With Vinci on board, Intu is aiming to add some extra theatre to the UK’s third-largest shopping centre. In May, CN took a tour.

Project: Barton Square, Trafford Centre
Client: Intu
Contract value: £52m
Main contractor: Vinci
Completion date: March 2020

 9) Inside Canary Wharf’s newest resi skyscraper: One Park Drive

One Park Drive is set to tower over a swathe of retail, commercial and residential buildings shooting up in the overhauled Wood Wharf area. CN visited in May.

Project: One Park Drive
Client: Canary Wharf Group
Main contractor: Canary Wharf Contractors
Contract value: Circa £100m*
Completion date: Q4 2020 up to level 28; remainder in Q1 2021
*Source: Barbour ABI

8) Factory records: Laing O’Rourke installs 160-tonne doors

From building above historic railways to installing massive soundproof doors, Laing O’Rourke has had to innovate to meet Manchester City Council’s exacting demands, as we found earlier this month.

Project: The Factory
Client: Manchester City Council
Central contract value:£108m
Main contractor: Laing O’Rourke
Completion date: 2021

7) Vinci links past and present

May saw CN visit the Tideway scheme in the east, as contractors sought solutions to join London’s super-sewer with its Victorian predecessor.

Project: Thames Tideway Tunnel, East
Client: Tideway
Contract value: £605m
Main contractor: Bachy Soletanche, Costain & Vinci Construction Grands Projets JV
Completion date: 2023

6) Prefab school build adds up for Berkeley

Reds10 claimed its modular school scheme in the heart of a new residential quarter in Reading was making a big cost saving compared with traditional methods. In August, CN went to see the build in action.

Project: Green Park Village Primary School, Reading
Client: St Edwards/Berkeley Group
Contract value: £6.1m
Main contractor: Reds10
Completion date: Oct 2019

5) Building into the water for Thames Tideway

Work by Ferrovial and Laing O’Rourke to prevent overflow sewage from entering the river involves the tricky job of floating a culvert into place, as CN found in October.

Project: Blackfriars Bridge Foreshore
Client: Tideway
Central contract value: £1bn*
Main contractor: Ferrovial and Laing O’Rourke joint venture
*Between Falconbrook Pumping Station in the west to Blackfriars Bridge in the east

4) Hinkley's ‘three megaprojects in one’

Amid cost hikes and potential delays on the project, we paid an exclusive visit in October to the huge Hinkley Point C site.

Project: Hinkley Point C
Client: EDF
Project value: £22.9bn
Main civils contractor: Bylor (Bouygues / Laing O’Rourke JV)
Completion date: 2025

3) Bam builds at the end of the Earth

Bam Nuttall is braving killer whales, icebergs and stark isolation in Antarctica to deliver a new wharf in time for the arrival of the RRS Sir David Attenborough. CN assessed progress at the start of the six-month building period.

Project: Rothera Research Station wharf, Antarctica
Client: British Antarctic Survey
Contract value: £100m
Main contractor: Bam Nuttall
Completion date: April 2020

2) Lendlease’s ‘Lego-like’ timber build

Source: Mike O'Dwyer

September saw CN visit an offsite development at Stratford’s Queen Elizabeth Olympic Park – a timber pavilion that is being built above the busy Docklands Light Railway.

Project: IQL Pavilion
Client: International Quarter London
Contract value: £200,000* (Overall IQL development value £2.4bn)
Main contractor: Lendlease
Completion date: Spring 2020
*Contract value estimated using Glenigan.com

1) Inside Leicester City FC’s new training ground

In November, CN headed to Leicestershire, as the main contractor faced a race against time to build a state-of-the-art training ground for the city’s Premier League football club in time for next season.

Project: Leicester City FC Training Ground
Client: Leicester City FC
Contract value: £95m
Main contractor: McLaren
Completion date: 29 June 2020

Related articles